PROCESS FLOW
PROCESS FLOW
STEPS The stage of Strategy of receiving an order The stage of Production preparing The stage of production The stage of A/S
The stage of Production The promotion of production The stage of Assembly The stage of Dock The stage of Quay
Business/
Planning/
Production
  • Estimation
  • Shipbuilding     sch.
        on business
  • Estimated     cost
  • Building     sdh.
  • M/S
  • Working     budget
  • Erection     NET
  • P.E Sch.
  • Block     PCS sch.
  • Outfitting     sch.
  • Yard area     arrangement
  • WOP
  • W/O
  • Monthly     plan
  • Request for     outside     order
  • Subcontract
  • WOP
  • W/O
  • Weekly     plan
  • Request     for     Outside     order
  • contract
  • Earned     Value
  • Setting     accounts
  • Performance
  • EVM     prediction
  • process     situation
  • Profit and     loss
  • Budget input     state
  • Man-hour     input state
  • Monitoring
  • Inspection
  • Comment
  • NCR
  • Crane,T/R
  • Arrangement
  • Block     movement
  • Performance     analysis
  • Reflection on     the future     shipbuilding
  • Design/
    Materials
  • BASIC     design
  • Drawing     info.
  • Design     process
  • Designing
  • Designing     volume
  • Material    delivery
  • POS/POR
  • PO,i-PO
  • Foreign     Meterial
  • Drawing     info.
  • Design     process
  • Designing
  • Designing     volume
  • Material    delivery
  • POS/POR
  • PO,i-PO
  • In/Output
  • Surplus     marerials
  •  
  • Performance     analysis
  • Reflection on     the future     shipbuilding

  • EPM SYSTEM for ship building and repair of small and medium shpyard
    poseidon 3.0
    Estination contract progress Schedule Bill Cost Accounting
  • shipowner
  • Estimation
  • Dock/Slipway
  • Contract
  • Materials Order
  • Outsourcing
  • Materials
  • Dock/Slipway
  • Planning of Work Schedule
  • Check List
  • Addition Progress Schedule
  • Wardhousing
  • Delivery
  • Paid/Unpaid
  • Equipment
  • Bring Back
  • Outsoutcing
  • Monitoring
  • Dock/Slipway
  • Work Done List
  • Bill
  • Collected Amount
  • Uncollected Amount
  • Tax
  • Surplus Materials
  • Cost Accountiong
  • Stock
  • costomer Satisfaction Surveys


  •  
    Giới thiệu về công ty   |  Dịch vụ   |   Khách hàng   |  Mạng  |  Liên hệ   |  Nhận tư vấn.  |  Bảng thông báo  
    shindong-logo HEAD OFFICE : JINYOUNG B/D, 1213-1, CHORYANG 1-DONG, DONG GU, BUSAN, KOREA 601-011 /
    TEL : +82 (51) 461 5050 / FAX : + 82 (51) 467 1034
    Copyright (C) 2011 Java Information Technology . all rights Reserved.
    gobiz-logo
     
    Catalogue caru_em catalogue SMRF900-II catalogue overview Location Dataroomnotice